|
The incompetence equation
|
07-14-2007
|
1,145
|
Download
File Size 128.2kB
|
|
During the user group I did this drill
|
10-14-2007
|
1,082
|
Download
File Size 275.8kB
|
|
I=UR^2 The SCRUM law of incompetence The incompetence level of a team has a strong correlation to the distance between the team members. In this picture, I demostrate what happens when my daughter and...
|
07-13-2007
|
1,074
|
Download
File Size 109.8kB
|
|
The presentation I gave in the Israeli PMI conference on May 31st, 2007
|
07-11-2007
|
987
|
Download
File Size 2.8MB
|
|
|
08-01-2007
|
979
|
Download
File Size 45.9kB
|
|
In SCRUM there is a way to pass a decision fast, it calls finger voting. A question is being asked and each team member raises his/her fingers accordingly (5-Yes, yes, let us do it, 4-OK with me, 3-I have...
|
07-11-2007
|
971
|
Download
File Size 105.5kB
|
|
The israeli answer to the pigs and chickens in SCRUM
|
08-01-2007
|
955
|
Download
File Size 468.9kB
|
|
Israeli Agile conference
|
08-30-2007
|
915
|
Download
File Size 200.1kB
|
|
The Israeli answer to the pigs and chicken story in SCRUM
|
08-01-2007
|
910
|
Download
File Size 468.9kB
|
|
|
08-02-2007
|
908
|
Download
File Size 45.7kB
|